The challenge
Damaged teeth on a slewing ring can quickly put a wind turbine out of action. Even minor damage leads to misalignment, increased stress on the drive system and, in the worst case, a complete shutdown. The common solution is to replace the entire slewing ring - a process that requires the use of a crane, longer downtime and significant spare parts costs.
The alternative
At Cetec Energy, we approach the problem differently. Our teams perform precision repairs up in the tower. With a specialised and proven swing ring repair procedure, the welding work is done up in the tower and the damaged teeth are rebuilt and restored without dismantling the nacelle.
The result
This method brings the workshop into the wind turbine. It's faster, far more cost-effective and extends the life of critical components. For operators, this means reduced downtime, controlled costs and turbines that are back in production within days - not weeks.